Do You Have To Waterproof A Concrete Bathroom Floor Before Tiling
How do you seal seams on cement board.
Do you have to waterproof a concrete bathroom floor before tiling. Do I need to waterproof concrete floor before tiling. Where a tile bed or screed is used the waterproof membrane shall be installed above or below the tile bed or screed. This includes the vertical joints between the walls and the horizontal joints between the walls and the floor.
Contrary to popular thought tile and grout are not waterproof and some moisture will penetrate even if sealant is used. Once your surfaces are primed use Neutral Core Silicone Sealer to run a generous bead along all internal corners. When you have your old floor up make sure you take the time to make any necessary repairs to your subfloor.
British Standards already supported waterproofing in commercial wet areas but under the new BS 5385-12018 clause 61. The first waterproofing coat should be applied no sooner than 4 hours after the priming. Prior to 1960 the average house didnt have any showers stalls only bath tubs with surround walls.
If the bathroom floor is either concrete or compressed fibre cement sheet flooring then there is no requirement for full waterproofing of the floor and the extent of floor waterproofing will depend on whether it has a bath with a shower over it or the shower recess is enclosed with a shower. Then leave it to dry for 24 hours. Therefore any concrete that may come into regular contact with water such as under tile or for a pool will need to be waterproofed.
Both are correct and have their various uses. However if you choose to use concrete backerboard which is much stronger and more durable than gypsum board a water vapor membrane must be placed underneath it or a sealant applied on top of it. If cement is not waterproofed it can cause issues with the mortar used between the tiles.
Water leaking into your floor and wall spaces can rot structural timbers and cause damage. After you have covered all of the membrane on the walls and bathroom floor with the waterproofing agent paint the rest of the floor. However to prevent moisture from the concrete floor from affecting your laminate install a vapor barrier of polyethylene film.